This page contains a matrix of the phase 3 functionality of the NETA Reports web-service.
Deliverables are either "Complete", "Yet to Start" or a intermediate state as detailed
in the status column. Actual delivery date or aniticipated delivery date is detailed
in the "Delivery Date" column. Much "Yet to Start" functionality will have a delivery
date of "T.B.A." which means they have yet to be prioritised.
The matrix contains a column detailing which subscription level the functionality
sits in. Almost all functionality on this page is in the autoreport subscription
level. There are some reports available in the guest subscription level
(i.e. to users who have just registered and not entered into a subscription agreement)
this is provided as a service to the market.
Currently the report definition code is complete and the delivery functionality is complete.
The only output format is Adobe viewer file (.PDF), HTML format is coming soon and XLS delivery
is coming soon but will exclude the generation of charts for the foreseable future.
Fuel Type reports contain data from BM units that have been aggregated by the fuel type of the BM unit.
Power Station reports contain data from BM units that have been aggregated by generation BM units in a power station.
| 52010 |
 |
Negative Applicable Balancing Services Volume by Power Station This is a pie chart that shows the negative ancilliary balancing services volume by power station. The chart is generated by totaling the negative ancilliary balancing services volume for every BM unit in each power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
08/04/2008 |
| 52020 |
 |
Positive Applicable Balancing Services Volume by Power Station This is a pie chart that shows the positive ancilliary balancing services volume by power station. The chart is generated by totaling the positive ancilliary balancing services volume for every BM unit in each power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
08/04/2008 |
| 52030 |
 |
Accepted Bid Volume by Power Station This is a pie chart that shows the accepted bid volume by power station. The chart is generated by totaling the accepted bid volume for every BM unit in each power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
08/04/2008 |
| 52040 |
 |
Accepted Offer Volume by Power Station This is a pie chart that shows the accepted offer volume by power station. The chart is generated by totaling the accepted offer volume for every BM unit in each power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
08/04/2008 |
| 52050 |
 |
Bid Offer Acceptance Count by Power Station This is a pie chart that shows the bid/offer acceptance count by power station. The chart is generated by totaling the bid/offer acceptance count for every BM unit in each power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
08/04/2008 |
| 52060 |
 |
FPN + Bid/Offer Volume by Power Station for Major Generation This is a pie chart that shows the FPN and bid/offer volumes for major generation by power station. The chart is generated by totaling the FPN and bid/offer volumes for every BM unit in each major generation power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
08/04/2008 |
| 52070 |
 |
FPN + Bid/Offer Volume by Power Station for Major Generation Time Series This is a stacked bar chart that shows the FPN and bid/offer volumes for major generation by power station as a time series. The chart is generated by totaling the FPN and bid/offer volumes for every BM unit in each major generation power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
08/04/2008 |
| 52080 |
 |
Metered Volume by Power Station for Major Generation This is a pie chart that shows the metered volume for major generation by power station. The chart is generated by totaling the metered volume for every BM unit in each major generation power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
08/04/2008 |
| 52090 |
 |
Metered Volume by Power Station for Major Generation Time Series This is a stacked bar chart that shows the metered volume for major generation by power station as a time series. The chart is generated by totaling the metered volume for every BM unit in each major generation power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
08/04/2008 |
| 52100 |
 |
Non Delivered Bid Volume by Power Station This is a pie chart that shows the non delivered bid volume by power station. The chart is generated by totaling the non delivered bid volume for every BM unit in each power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
08/04/2008 |
| 52110 |
 |
Non Delivery Charge by Power Station This is a pie chart that shows the non delivery charge by power station. The chart is generated by totaling the non delivery charge for every BM unit in each power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
08/04/2008 |
| 52120 |
 |
Non Delivered Offer Volume by Power Station This is a pie chart that shows the non delivered offer volume by power station. The chart is generated by totaling the non delivered offer volume for every BM unit in each power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
08/04/2008 |
| 52130 |
 |
Accepted Bid Cashflow by Power Station This is a bar chart that shows the accepted bid cashflow by power station. The chart is generated by totaling the accepted bid cashflows for each BM unit for each power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
29/04/2008 |
| 52140 |
 |
Accepted Offer Cashflow by Power Station This is a bar chart that shows the accepted offer cashflow by power station. The chart is generated by totaling the accepted offer cashflows for each BM unit for each power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
29/04/2008 |
| 52150 |
 |
Bid Price by Power Station This is a bar chart that shows the achieved bid price by power station. The chart is generated by generating a weighted average of the achieved bid prices for each BM unit for each power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
29/04/2008 |
| 52160 |
 |
Offer Price by Power Station This is a bar chart that shows the achieved offer price by power station. The chart is generated by generating a weighted average of the achieved offer prices for each BM unit for each power station. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
29/04/2008 |
| 52170 |
 |
Availability and Utilisation for Power Stations Using Metered Volumes This chart shows the metered volume, MEL volume and generation capacity of generation BM units by power station. The chart is generated by grouping these three values for each generation BM unit for each power station. The utilisation component is the metered volume, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/11/2010 |
| 52180 |
 |
Availability and Utilisation for Power Stations Using FPN and Bid/Offer Volume This chart shows the final physical notification plus any bid and offer volumes, MEL volume and generation capacity of generation BM units by power station. The chart is generated by grouping these three values for each generation BM unit for each power station. The utilisation component is the final physical notification plus any bid and offer volumes, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/11/2010 |
| 52190 |
 |
Availability and Utilisation for CCGT Power Stations Using Metered Volumes This chart shows the metered volume, MEL volume and generation capacity of CCGT BM units by power station. The chart is generated by grouping these three values for each CCGT BM unit for each power station. The utilisation component is the metered volume, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
02/12/2010 |
| 52200 |
 |
Availability and Utilisation for CCGT Power Stations Using FPN and Bid/Offer Volume This chart shows the final physical notification plus any bid and offer volumes, MEL volume and generation capacity of CCGT BM units by power station. The chart is generated by grouping these three values for each CCGT BM unit for each power station. The utilisation component is the final physical notification plus any bid and offer volumes, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
02/12/2010 |
| 52210 |
 |
Availability and Utilisation for Coal Power Stations Using Metered Volumes This chart shows the metered volume, MEL volume and generation capacity of coal BM units by power station. The chart is generated by grouping these three values for each coal BM unit for each power station. The utilisation component is the metered volume, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
02/12/2010 |
| 52220 |
 |
Availability and Utilisation for Coal Power Stations Using FPN and Bid/Offer Volume This chart shows the final physical notification plus any bid and offer volumes, MEL volume and generation capacity of coal BM units by power station. The chart is generated by grouping these three values for each coal BM unit for each power station. The utilisation component is the final physical notification plus any bid and offer volumes, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
02/12/2010 |
| 52230 |
 |
Availability and Utilisation for Non Pumped Storage Hydro Power Stations Using Metered Volumes This chart shows the metered volume, MEL volume and generation capacity of non pumped storage hydro BM units by power station. The chart is generated by grouping these three values for each non pumped storage hydro BM unit for each power station. The utilisation component is the metered volume, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
02/12/2010 |
| 52240 |
 |
Availability and Utilisation for Non Pumped Storage Hydro Power Stations Using FPN and Bid/Offer Volume This chart shows the final physical notification plus any bid and offer volumes, MEL volume and generation capacity of non pumped storage hydro BM units by power station. The chart is generated by grouping these three values for each non pumped storage hydro BM unit for each power station. The utilisation component is the final physical notification plus any bid and offer volumes, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
02/12/2010 |
| 52250 |
 |
Availability and Utilisation for Nuclear Power Stations Using Metered Volumes This chart shows the metered volume, MEL volume and generation capacity of nuclear BM units by power station. The chart is generated by grouping these three values for each nuclear BM unit for each power station. The utilisation component is the metered volume, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
02/12/2010 |
| 52260 |
 |
Availability and Utilisation for Nuclear Power Stations Using FPN and Bid/Offer Volume This chart shows the final physical notification plus any bid and offer volumes, MEL volume and generation capacity of nuclear BM units by power station. The chart is generated by grouping these three values for each nuclear BM unit for each power station. The utilisation component is the final physical notification plus any bid and offer volumes, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
02/12/2010 |
| 52270 |
 |
Availability and Utilisation for OCGT Power Stations Using Metered Volumes This chart shows the metered volume, MEL volume and generation capacity of OCGT BM units by power station. The chart is generated by grouping these three values for each OCGT BM unit for each power station. The utilisation component is the metered volume, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
02/12/2010 |
| 52280 |
 |
Availability and Utilisation for OCGT Power Stations Using FPN and Bid/Offer Volume This chart shows the final physical notification plus any bid and offer volumes, MEL volume and generation capacity of OCGT BM units by power station. The chart is generated by grouping these three values for each OCGT BM unit for each power station. The utilisation component is the final physical notification plus any bid and offer volumes, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
02/12/2010 |
| 52290 |
 |
Availability and Utilisation for Oil Power Stations Using Metered Volumes This chart shows the metered volume, MEL volume and generation capacity of oil BM units by power station. The chart is generated by grouping these three values for each oil BM unit for each power station. The utilisation component is the metered volume, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
02/12/2010 |
| 52300 |
 |
Availability and Utilisation for Oil Power Stations Using FPN and Bid/Offer Volume This chart shows the final physical notification plus any bid and offer volumes, MEL volume and generation capacity of oil BM units by power station. The chart is generated by grouping these three values for each oil BM unit for each power station. The utilisation component is the final physical notification plus any bid and offer volumes, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
02/12/2010 |
| 52310 |
 |
Availability and Utilisation for Wind Power Stations Using Metered Volumes This chart shows the metered volume, MEL volume and generation capacity of wind BM units by power station. The chart is generated by grouping these three values for each wind BM unit for each power station. The utilisation component is the metered volume, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
02/12/2010 |
| 52320 |
 |
Availability and Utilisation for Wind Power Stations Using FPN and Bid/Offer Volume This chart shows the final physical notification plus any bid and offer volumes, MEL volume and generation capacity of wind BM units by power station. The chart is generated by grouping these three values for each wind BM unit for each power station. The utilisation component is the final physical notification plus any bid and offer volumes, the excess availability component is the difference between the MEL and the generation (the unused MEL) and the excess capacity is the difference between the generation capacity and the MEL. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
02/12/2010 |
BSC Party reports contain data from BM units that have been aggregated by the BSC Party of the BM unit.
Super Party reports contain data from BM Units that have been aggregated by the super party ownership proportion of the BM unit.
Super Party / Fuel Type reports contain data from BM Units that have been aggregated by the fuel type and super party ownership proportion of the BM unit.
| 60010 |
 |
FPN + Bid/Offer Volume by Super Party for French Interconnector This is a bar chart that shows the final physical notification plus any bid and offer volumes by super party for energy going to and from the continent on the French Interconnector. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units in each direction on the French Interconnector by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60020 |
 |
FPN + Bid/Offer Volume by Super Party for Scottish Interconnector This is a bar chart that shows the final physical notification plus any bid and offer volumes by super party for energy going to and from Scotland on the Scottish Interconnectors. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units in each direction on the Scottish Interconnectors by super party. The Scottish Interconnectors do not exist in the BETTA market model (although they are physically still there). |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60030 |
 |
FPN + Bid/Offer Volume by Super Party for Moyle Interconnector This is a bar chart that shows the final physical notification plus any bid and offer volumes by super party for energy going to and from Northern Ireland on the Moyle Interconnector. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units in each direction on the Moyle Interconnector by super party. The Moyle Interconnector does not exist in the NETA market model (because it lands in Scotland). |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60040 |
 |
FPN + Bid/Offer Volume by Super Party for Major Generation Time Series This is a stacked bar chart that shows the final physical notification plus any bid and offer volumes by super party for each major generation type and the total of all major generation. The chart is generated by totaling the final physical notification plus any bid and offer volumes for all BM units of a major generation type for each bar and another bar for the total of all major generation by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60050 |
 |
FPN + Bid/Offer Volume by Super Party for Major Generation This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for major generation. The chart is generated by totaling the final physical notification plus any bid and offer volumes for all generation BM units by super party. |
|
guest |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60060 |
 |
FPN + Bid/Offer Volume by Super Party for all SVA BM units This is a stacked bar chart that shows the final physical notification plus any bid and offer volumes by super party for each GSP Group and the total of all GSP Groups. The chart is generated by totaling the final physical notification plus any bid and offer volumes for all SVA container BM units in a GSP Group for each bar and another bar for the total of all GSP Groups by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60070 |
 |
FPN + Bid/Offer Volume by Super Party for all SVA BM units This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for all GSP Groups. The chart is generated by totaling the final physical notification plus any bid and offer volumes for all SVA container BM units by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60080 |
 |
FPN + Bid/Offer Volume by Super Party for Bone Meal This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for bone meal. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which burn bone meal to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60090 |
 |
FPN + Bid/Offer Volume by Super Party for C.C.G.T. This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for C.C.G.T.. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which use C.C.G.T. technology to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60100 |
 |
FPN + Bid/Offer Volume by Super Party for Poultry Litter This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for poultry litter. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which burn poultry litter to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60110 |
 |
FPN + Bid/Offer Volume by Super Party for C.H.P. This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for C.H.P.. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which use C.H.P. technology to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60120 |
 |
FPN + Bid/Offer Volume by Super Party for Coal/Gas This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for coal/gas. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which can burn either coal or gas to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60130 |
 |
FPN + Bid/Offer Volume by Super Party for Coal/Oil This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for coal/oil. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which can burn either coal or oil to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60140 |
 |
FPN + Bid/Offer Volume by Super Party for Opted-In Coal This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for opted in coal. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which burn coal to generate electricity and are opted-in to the LCPD by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60145 |
 |
FPN + Bid/Offer Volume by Super Party for Opted-Out Coal This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for opted out coal. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which burn coal to generate electricity and are opted out of the LCPD by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
01/01/2008 |
| 60150 |
 |
FPN + Bid/Offer Volume by Super Party for Diesel/Gas This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for diesel/gas. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which can burn either diesel or gas to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60160 |
 |
FPN + Bid/Offer Volume by Super Party for Diesel/Gas This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for diesel. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which burn diesel to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60170 |
 |
FPN + Bid/Offer Volume by Super Party for French Interconnector Demand This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for energy going to the continent on the French Interconnector. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which send energy to the continent on the French Interconnector by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60180 |
 |
FPN + Bid/Offer Volume by Super Party for French Interconnector Generation This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for energy coming from the continent on the French Interconnector. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which receive energy from the continent on the French Interconnector by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60190 |
 |
FPN + Bid/Offer Volume by Super Party for Gas/Oil This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for gas/oil. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which can burn either gas or oil to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60200 |
 |
FPN + Bid/Offer Volume by Super Party for Gas (O.C.G.T.) This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for gas (O.C.G.T.). The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which burn gas in an open cycle gas turbine to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60210 |
 |
FPN + Bid/Offer Volume by Super Party for Hydro This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for hydro. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which use hydro (not pumped storage) technology to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60220 |
 |
FPN + Bid/Offer Volume by Super Party for Moyle Interconnector Demand This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for energy going to Northern Ireland on the Moyle Interconnector. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which send energy to Northern Ireland on the Moyle Interconnector by super party. The Moyle Interconnector does not exist in the NETA market model (because it lands in Scotland). |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60230 |
 |
FPN + Bid/Offer Volume by Super Party for Moyle Interconnector Generation This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for energy coming from Northern Ireland on the Moyle Interconnector. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which receive energy from Northern Ireland on the Moyle Interconnector by super party. The Moyle Interconnector does not exist in the NETA market model (because it lands in Scotland). |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60240 |
 |
FPN + Bid/Offer Volume by Super Party for Nuclear This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for nuclear. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which use nuclear technology to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60250 |
 |
FPN + Bid/Offer Volume by Super Party for Oil This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for oil. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which burn oil to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60260 |
 |
FPN + Bid/Offer Volume by Super Party for Scottish Interconnector Demand This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for energy going to Scotland on the Scottish Interconnectors. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which send energy to Scotland on the Scottish Interconnectors by super party. The Scottish Interconnectors do not exist in the BETTA market model (although they are physically still there). |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60270 |
 |
FPN + Bid/Offer Volume by Super Party for Scottish Interconnector Generation This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for energy coming from Scotland on the Scottish Interconnectors. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which receive energy from Scotland on the Scottish Interconnectors by super party. The Scottish Interconnectors do not exist in the BETTA market model (although they are physically still there). |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60280 |
 |
FPN + Bid/Offer Volume by Super Party for Eastern GSP Group This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for Eastern GSP Group. The chart is generated by totaling the final physical notification plus any bid and offer volumes for SVA container BM units in the Eastern GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60290 |
 |
FPN + Bid/Offer Volume by Super Party for East Midlands GSP Group This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for East Midlands GSP Group. The chart is generated by totaling the final physical notification plus any bid and offer volumes for SVA container BM units in the East Midlands GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60300 |
 |
FPN + Bid/Offer Volume by Super Party for London GSP Group This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for London GSP Group. The chart is generated by totaling the final physical notification plus any bid and offer volumes for SVA container BM units in the London GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60310 |
 |
FPN + Bid/Offer Volume by Super Party for Merseyside and North Wales This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for Merseyside and North Wales GSP Group. The chart is generated by totaling the final physical notification plus any bid and offer volumes for SVA container BM units in the Merseyside and North Wales GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60320 |
 |
FPN + Bid/Offer Volume by Super Party for Midlands GSP Group This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for Midlands GSP Group. The chart is generated by totaling the final physical notification plus any bid and offer volumes for SVA container BM units in the Midlands GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60330 |
 |
FPN + Bid/Offer Volume by Super Party for Northern GSP Group This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for Northern GSP Group. The chart is generated by totaling the final physical notification plus any bid and offer volumes for SVA container BM units in the Northern GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60340 |
 |
FPN + Bid/Offer Volume by Super Party for North Western GSP Group This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for North Western GSP Group. The chart is generated by totaling the final physical notification plus any bid and offer volumes for SVA container BM units in the North Western GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60350 |
 |
FPN + Bid/Offer Volume by Super Party for Southern GSP Group This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for Southern GSP Group. The chart is generated by totaling the final physical notification plus any bid and offer volumes for SVA container BM units in the Southern GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60360 |
 |
FPN + Bid/Offer Volume by Super Party for South Eastern GSP Group This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for South Eastern GSP Group. The chart is generated by totaling the final physical notification plus any bid and offer volumes for SVA container BM units in the South Eastern GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60370 |
 |
FPN + Bid/Offer Volume by Super Party for South Wales GSP Group This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for South Wales GSP Group. The chart is generated by totaling the final physical notification plus any bid and offer volumes for SVA container BM units in the South Wales GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60380 |
 |
FPN + Bid/Offer Volume by Super Party for South Western GSP Group This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for South Western GSP Group. The chart is generated by totaling the final physical notification plus any bid and offer volumes for SVA container BM units in the South Western GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60390 |
 |
FPN + Bid/Offer Volume by Super Party for Yorkshire GSP Group This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for Yorkshire GSP Group. The chart is generated by totaling the final physical notification plus any bid and offer volumes for SVA container BM units in the Yorkshire GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60400 |
 |
FPN + Bid/Offer Volume by Super Party for South Scotland GSP Group This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for South Scotland GSP Group. The chart is generated by totaling the final physical notification plus any bid and offer volumes for SVA container BM units in the South Scotland GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60410 |
 |
FPN + Bid/Offer Volume by Super Party for North Scotland GSP Group This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for North Scotland GSP Group. The chart is generated by totaling the final physical notification plus any bid and offer volumes for SVA container BM units in the North Scotland GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 60420 |
 |
FPN + Bid/Offer Volume by Super Party for Wind This is a pie chart that shows the final physical notification plus any bid and offer volumes by super party for wind. The chart is generated by totaling the final physical notification plus any bid and offer volumes for BM units which use wind technology to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62010 |
 |
Metered Volume by Super Party for French Interconnector This is a bar chart that shows the metered volume by super party for energy going to and from the continent on the French Interconnector. The chart is generated by totaling the metered volume for BM units in each direction on the French Interconnector by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62020 |
 |
Metered Volume by Super Party for Scottish Interconnector This is a bar chart that shows the metered volume by super party for energy going to and from Scotland on the Scottish Interconnectors. The chart is generated by totaling the metered volume for BM units in each direction on the Scottish Interconnectors by super party. The Scottish Interconnectors do not exist in the BETTA market model (although they are physically still there). |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62030 |
 |
Metered Volume by Super Party for Moyle Interconnector This is a bar chart that shows the metered volume by super party for energy going to and from Northern Ireland on the Moyle Interconnector. The chart is generated by totaling the metered volume for BM units in each direction on the Moyle Interconnector by super party. The Moyle Interconnector does not exist in the NETA market model (because it lands in Scotland). |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62040 |
 |
Metered Volume by Super Party for Major Generation Time Series This is a stacked bar chart that shows the metered volume by super party for each major generation type and the total of all major generation. The chart is generated by totaling the metered volume for all BM units of a major generation type for each bar and another bar for the total of all major generation by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62050 |
 |
Metered Volume by Super Party for Major Generation This is a pie chart that shows the metered volume by super party for major generation. The chart is generated by totaling the metered volume for all generation BM units by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62060 |
 |
Metered Volume by Super Party for all SVA BM units This is a stacked bar chart that shows the metered volume by super party for each GSP Group and the total of all GSP Groups. The chart is generated by totaling the metered volume for all SVA container BM units in a GSP Group for each bar and another bar for the total of all GSP Groups by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62070 |
 |
Metered Volume by Super Party for all SVA BM units This is a pie chart that shows the metered volume by super party for all GSP Groups. The chart is generated by totaling the metered volume for all SVA container BM units by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62080 |
 |
Metered Volume by Super Party for Bone Meal This is a pie chart that shows the metered volume by super party for bone meal. The chart is generated by totaling the metered volume for BM units which burn bone meal to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62090 |
 |
Metered Volume by Super Party for C.C.G.T. This is a pie chart that shows the metered volume by super party for C.C.G.T.. The chart is generated by totaling the metered volume for BM units which use C.C.G.T. technology to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62100 |
 |
Metered Volume by Super Party for Poultry Litter This is a pie chart that shows the metered volume by super party for poultry litter. The chart is generated by totaling the metered volume for BM units which burn poultry litter to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62110 |
 |
Metered Volume by Super Party for C.H.P. This is a pie chart that shows the metered volume by super party for C.H.P.. The chart is generated by totaling the metered volume for BM units which use C.H.P. technology to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62120 |
 |
Metered Volume by Super Party for Coal/Gas This is a pie chart that shows the metered volume by super party for coal/gas. The chart is generated by totaling the metered volume for BM units which can burn either coal or gas to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62130 |
 |
Metered Volume by Super Party for Coal/Oil This is a pie chart that shows the metered volume by super party for coal/oil. The chart is generated by totaling the metered volume for BM units which can burn either coal or oil to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62140 |
 |
Metered Volume by Super Party for Opted-In Coal This is a pie chart that shows the metered volume by super party for opted in coal. The chart is generated by totaling the metered volume for BM units which burn coal to generate electricity and are opted in to the LCPDby super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62145 |
 |
Metered Volume by Super Party for Opted-Out Coal This is a pie chart that shows the metered volume by super party for opted out coal. The chart is generated by totaling the metered volume for BM units which burn coal to generate electricity and are opted out of the LCPD by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
01/01/2008 |
| 62150 |
 |
Metered Volume by Super Party for Diesel/Gas This is a pie chart that shows the metered volume by super party for diesel/gas. The chart is generated by totaling the metered volume for BM units which can burn either diesel or gas to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62160 |
 |
Metered Volume by Super Party for Diesel This is a pie chart that shows the metered volume by super party for diesel. The chart is generated by totaling the metered volume for BM units which burn diesel to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62170 |
 |
Metered Volume by Super Party for French Interconnector Demand This is a pie chart that shows the metered volume by super party for energy going to the continent on the French Interconnector. The chart is generated by totaling the metered volume for BM units which send energy to the continent on the French Interconnector by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62180 |
 |
Metered Volume by Super Party for French Interconnector Generation This is a pie chart that shows the metered volume by super party for energy coming from the continent on the French Interconnector. The chart is generated by totaling the metered volume for BM units which receive energy from the continent on the French Interconnector by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62190 |
 |
Metered Volume by Super Party for Gas/Oil This is a pie chart that shows the metered volume by super party for gas/oil. The chart is generated by totaling the metered volume for BM units which can burn either gas or oil to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62200 |
 |
Metered Volume by Super Party for Gas (O.C.G.T.) This is a pie chart that shows the metered volume by super party for gas (O.C.G.T.). The chart is generated by totaling the metered volume for BM units which burn gas in an open cycle gas turbine to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62210 |
 |
Metered Volume by Super Party for Hydro This is a pie chart that shows the metered volume by super party for hydro. The chart is generated by totaling the metered volume for BM units which use hydro (not pumped storage) technology to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62220 |
 |
Metered Volume by Super Party for Moyle Interconnector Demand This is a pie chart that shows the metered volume by super party for energy going to Northern Ireland on the Moyle Interconnector. The chart is generated by totaling the metered volume for BM units which send energy to Northern Ireland on the Moyle Interconnector by super party. The Moyle Interconnector does not exist in the NETA market model (because it lands in Scotland). |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62230 |
 |
Metered Volume by Super Party for Moyle Interconnector Generation This is a pie chart that shows the metered volume by super party for energy coming from Northern Ireland on the Moyle Interconnector. The chart is generated by totaling the metered volume for BM units which receive energy from Northern Ireland on the Moyle Interconnector by super party. The Moyle Interconnector does not exist in the NETA market model (because it lands in Scotland). |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62240 |
 |
Metered Volume by Super Party for Nuclear This is a pie chart that shows the metered volume by super party for nuclear. The chart is generated by totaling the metered volume for BM units which use nuclear technology to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62250 |
 |
Metered Volume by Super Party for Oil This is a pie chart that shows the metered volume by super party for oil. The chart is generated by totaling the metered volume for BM units which burn oil to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62260 |
 |
Metered Volume by Super Party for Scottish Interconnector Demand This is a pie chart that shows the metered volume by super party for energy going to Scotland on the Scottish Interconnectors. The chart is generated by totaling the metered volume for BM units which send energy to Scotland on the Scottish Interconnectors by super party. The Scottish Interconnectors do not exist in the BETTA market model (although they are physically still there). |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62270 |
 |
Metered Volume by Super Party for Scottish Interconnector Generation This is a pie chart that shows the metered volume by super party for energy coming from Scotland on the Scottish Interconnectors. The chart is generated by totaling the metered volume for BM units which receive energy from Scotland on the Scottish Interconnectors by super party. The Scottish Interconnectors do not exist in the BETTA market model (although they are physically still there). |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62280 |
 |
Metered Volume by Super Party for Eastern GSP Group This is a pie chart that shows the metered volume by super party for Eastern GSP Group. The chart is generated by totaling the metered volume for SVA container BM units in the Eastern GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62290 |
 |
Metered Volume by Super Party for East Midlands GSP Group This is a pie chart that shows the metered volume by super party for East Midlands GSP Group. The chart is generated by totaling the metered volume for SVA container BM units in the East Midlands GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62300 |
 |
Metered Volume by Super Party for London GSP Group This is a pie chart that shows the metered volume by super party for London GSP Group. The chart is generated by totaling the metered volume for SVA container BM units in the London GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62310 |
 |
Metered Volume by Super Party for Merseyside and North Wales This is a pie chart that shows the metered volume by super party for Merseyside and North Wales GSP Group. The chart is generated by totaling the metered volume for SVA container BM units in the Merseyside and North Wales GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62320 |
 |
Metered Volume by Super Party for Midlands GSP Group This is a pie chart that shows the metered volume by super party for Midlands GSP Group. The chart is generated by totaling the metered volume for SVA container BM units in the Midlands GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62330 |
 |
Metered Volume by Super Party for Northern GSP Group This is a pie chart that shows the metered volume by super party for Northern GSP Group. The chart is generated by totaling the metered volume for SVA container BM units in the Northern GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62340 |
 |
Metered Volume by Super Party for North Western GSP Group This is a pie chart that shows the metered volume by super party for North Western GSP Group. The chart is generated by totaling the metered volume for SVA container BM units in the North Western GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62350 |
 |
Metered Volume by Super Party for Southern GSP Group This is a pie chart that shows the metered volume by super party for Southern GSP Group. The chart is generated by totaling the metered volume for SVA container BM units in the Southern GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62360 |
 |
Metered Volume by Super Party for South Eastern GSP Group This is a pie chart that shows the metered volume by super party for South Eastern GSP Group. The chart is generated by totaling the metered volume for SVA container BM units in the South Eastern GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62370 |
 |
Metered Volume by Super Party for South Wales GSP Group This is a pie chart that shows the metered volume by super party for South Wales GSP Group. The chart is generated by totaling the metered volume for SVA container BM units in the South Wales GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62380 |
 |
Metered Volume by Super Party for South Western GSP Group This is a pie chart that shows the metered volume by super party for South Western GSP Group. The chart is generated by totaling the metered volume for SVA container BM units in the South Western GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62390 |
 |
Metered Volume by Super Party for Yorkshire GSP Group This is a pie chart that shows the metered volume by super party for Yorkshire GSP Group. The chart is generated by totaling the metered volume for SVA container BM units in the Yorkshire GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62400 |
 |
Metered Volume by Super Party for South Scotland GSP Group This is a pie chart that shows the metered volume by super party for South Scotland GSP Group. The chart is generated by totaling the metered volume for SVA container BM units in the South Scotland GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62410 |
 |
Metered Volume by Super Party for North Scotland GSP Group This is a pie chart that shows the metered volume by super party for North Scotland GSP Group. The chart is generated by totaling the metered volume for SVA container BM units in the North Scotland GSP group by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |
| 62420 |
 |
Metered Volume by Super Party for Wind This is a pie chart that shows the metered volume by super party for wind. The chart is generated by totaling the metered volume for BM units which use wind technology to generate electricity by super party. |
|
autoreport |
autoreport |
autoreport |
autoreport |
Complete |
18/12/2005 |